(1)
Fathurrahman, F.; Akbar, H.; Siregar, R. H.; Utami, R. S.; Syukri, M.; Fachri, M. R.; Malahayati, M. Performance Analysis Of Centrifugal End Suction Pump And Three Phase Induction Motor In The Distribution Pumping Station of PDAM Tirta Mountala, Aceh Besar Regency. CRC 2025, 9 (1), 65-84. https://doi.org/10.22373/crc.v9i1.27241.