The electric power distribution system on the transmission line side is carried out at the substati on, which contains several bays. However, containing the primary equipment discussed in this study regarding the Current Transformer (CT) of the CT OSKF-170 type, so that the electric power distribution system can be carried out optimally. The research location is substation area (GI), where the maintenance side is optimised and tested to prevent extensive damage to the substation's electric power distribution. If the CT has damage or disturbances such as current leakage that create inefficient power distribution losses, it can be replaced. Thus, this study examined the results of the insulation resistance measurement of more than 1000 G and on the secondary side the results were 100-500 MΩ. Then, the value of grounding resistance in the R, S, and T phases was less than 1Ω, the tan delta test yielded a measurement value of less than 1 percent, and the turns ratio in the transformer corresponds to the ratio value on the CT OSKF-170 nameplate. The outcomes of the tests were satisfactory in accordance with the criteria for CT maintenance standards.
References
Alstom. (2014). OSKF Current Transformers 72.5 KV to 765 KV. 1–4. www.grid.alstom.com.
Baqaruzi, Syamsyarief, and Ali Muhtar. (2020). Analisis Jatuh Tegangan Dan Rugi-Rugi Akibat Pengaruh Penggunaan Distributed Generation Pada Sistem Distribusi Primer 20 KV. EJOINT
(Electronica and Electrical Journal of Innovation Technology) 1(1): 20–26.
https://ejournal.pnc.ac.id/index.php/ejoint/article/view/216/pdf.
Draxler, Karel, Renata Styblíková, Jan Kucera, and Vlastimil Rada. (2012). Calibration of an Instrument Current Transformer at a Ratio of 20 KA/5 A. In 2012 Conference on Precision Electromagnetic Measurements, , 14–15.
IEEE Guide for Dry-Type Transformer Through-Fault Current Duration. (2015). IEEE Std C57.12.59-2015 (Revision of IEEE Std C57.12.59-2001): 1–21.
Ilyas, Iriandi, and Muhamad Taufan Agassy. (2021). Analisis Kegagalan Current Transformer ( Ct) Tipe Dua Belitan Sekunder Dengan Inti Magnetik Terpisah Pada Sistem Proteksi Dan Pembatas Daya. Program Studi Teknik Elektro FTI-ISTN Sinusoida XXIII(1): 1–10.
Kalosa, Muhammad Sidik, Sabar Setiawidayat, and Mohammad Mukhsim. (2020). Pengaruh Sistem Pentanahan Terhadap Arus Gangguan Tanah Pada Sistem Distribusi 20 Kv. CIRCUIT: Jurnal Ilmiah Pendidikan Teknik Elektro 4(2): 138.
PT. PLN. (2014). Buku Pedoman Pemeliharaan Trafo Arus (CT). (0520): 2–3.
Rao, N Maheswara et al. (2019). Understanding of HV Current Transformer Failures During Short-Time Current Tests - An Insight of Current Density Calculations Beyond IEC Standards. In 2019 International Conference on High Voltage Engineering and Technology (ICHVET), 1–6.
Standar PT PLN (PERSERO) T5.005:2014. (2014). Pedoman Pembangunan Gardu Induk 66 Kv Minimalis. (0475).
Tambunan, Juara Mangapul. (2018). Pengujian Rutin Trafo Arus 24 kv di Laboratorium Hubung
Singkat PT. PLN (persero) puslitbang ketenagalistrikan.”
Zoro, Reynaldo, Gde K.M. Atmajaya, and Bryan Denov. (2019). Lightning Protection System for High Voltage Transmission Line in Indonesia. Proceedings of the 2nd International Conference on High Voltage Engineering and Power Systems: Towards Sustainable and Reliable Power Delivery, ICHVEPS 2019 (November).
Downloads
Published
Issue
Section
License
Authors who publish in this journal agree to the following terms:
- Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
The Journal uses license CC-BY-SA or an equivalent license as the optimal license for the publication, distribution, use, and reuse of scholarly works.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).